{"title":"Shop for Puppy Supplies","description":"","products":[{"product_id":"advance-puppy-growth-chicken-15kg","title":"Advance Dog Food Puppy Medium Breed Chicken with Rice","description":"\u003cp\u003e\u003cstrong\u003eAdvance Puppy Growth All Breed Dry Dog Food - Chicken with Rice\u003c\/strong\u003e is a super premium food for puppies with select natural ingredients. Contains nutrients to support brain development, digestive health, immune health and a healthy skin and shiny coat, Advance is scientifically formulated to help improve dog health.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eIngredients: \u003c\/strong\u003eChicken Meal, Rice, Maize Gluten, Chicken Fat, Sorghum, Dried Beet Pulp, Natural Flavour (Chicken), Sunflower Oil, Turkey Meal, Minerals, Salt, Inulin, Vitamins, Fish Oil, Colostrum, Antioxidants. \u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003eProtein 31.5% ; Fat 21% \u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eLifestage:\u003c\/strong\u003e Medium breed puppies, aged up to 15 months\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSize: \u003c\/strong\u003e800g, 3kg \u0026amp; 15kg\u003cbr\u003e\u003c\/p\u003e","brand":"Advance","offers":[{"title":"3kg","offer_id":32466335367248,"sku":"41333","price":43.2,"currency_code":"AUD","in_stock":true},{"title":"15kg","offer_id":41910138208336,"sku":"41335","price":144.49,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0484\/0009\/files\/advance-dog-food-puppy-medium-breed-chicken-with-ricekellyville-pets-4513539.png?v=1753536857"},{"product_id":"advance-puppy-large-breed-growth-chicken-15kg","title":"Advance Dog Food Puppy Large Breed Chicken with Rice","description":"\u003cp\u003e\u003cstrong\u003eAdvance Puppy Growth Large+ Breed Dry Dog Food - Chicken\u003c\/strong\u003e is a super premium food for puppies with select natural ingredients.  Specifically designed to achieve a controlled growth rate in large and giant breeds, through optimal calories and calcium\/phosphorus ratios.  Also contains nutrients to support brain development, immune health, joint health and a healthy skin and shiny coat, Advance is scientifically formulated to help improve dog health.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eIngredients: \u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003eChicken Meal, Rice, Maize Gluten, Chicken Fat, Sorghum, Dried Beet Pulp, Sunflower Oil, Natural Flavour (Chicken), Turkey Meal, Minerals, Salt, Inulin, Vitamins, Fish Oil, Green Lipped Mussel Powder, Antioxidants.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003eProtein 28% ; Fat 17%\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003eSuitable for: Large Breed Puppies, up to 21 months of age\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSize:\u003c\/strong\u003e 15kg\u003cbr\u003e\u003c\/p\u003e","brand":"Advance","offers":[{"title":"15kg","offer_id":41878462398544,"sku":"41337","price":144.49,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0484\/0009\/files\/advance-dog-food-puppy-large-breed-chicken-with-ricekellyville-pets-2597020.png?v=1764712927"},{"product_id":"hills-puppy-savoury-stew-with-chicken-vegetables-363g","title":"Hill's Science Diet Dog Food Can Puppy Savoury Stew Chicken \u0026 Vegetables","description":"\u003cp\u003eYou want to give your puppy the best start on life possible, and Hill's Science Diet Puppy Savoury Stew with Chicken \u0026amp; Vegetables is a delicious way to provide precisely balanced nutrition that is important to the overall health and wellbeing of your growing puppy. Easy-to-digest ingredients make stool pickup easy. Made with real chicken and wholesome grains, this puppy food made with natural ingredients provides balanced minerals to promote strong bones and healthy teeth in your young dog.\u003cbr\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eThis puppy food provides DHA from fish oil for healthy brain \u0026amp; eye development\u003c\/li\u003e\n\u003cli\u003eUses a Balanced set of minerals to promote strong bones and strong teeth in young dogs\u003c\/li\u003e\n\u003cli\u003eMade with purposeful, easily digestible ingredients your puppy will love\u003c\/li\u003e\n\u003cli\u003eDelightful wet food made with natural ingredients\u003c\/li\u003e\n\u003cli\u003eMade in the USA with global ingredients you can trust\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eProtein 5% ; Fat 2%\u003cbr\u003e\u003cbr\u003eRecommended for: Puppies up to 1 year old and pregnant or nursing dogs.\u003cbr\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cspan data-mce-fragment=\"1\"\u003eSize: Carton of 12 x 363g Cans\u003c\/span\u003e\u003cbr\u003e\u003c\/p\u003e","brand":"Hill's Science Diet","offers":[{"title":"363g x 12","offer_id":42288783949904,"sku":"43215","price":72.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0484\/0009\/products\/hills-science-diet-dog-food-can-puppy-savoury-stew-chicken-vegetableskellyville-pets-481242.jpg?v=1753536900"},{"product_id":"royal-canin-dog-labrador-junior-12kg","title":"Royal Canin Dog Food Puppy Labrador","description":"\u003cp\u003eBecause your puppy’s immune system develops gradually, Royal Canin Labrador Retriever Puppy contains an exclusive complex of antioxidants – including vitamin E – to help support its natural defences during this key period of growth. Thanks to a specially adapted content of energy, protein, calcium and phosphorus, Royal Canin Labrador Retriever Puppy contributes to the healthy development of your growing puppy’s bone structure. It also helps to facilitate harmonious weight gain, to help your puppy maintain an ideal weight as it grows.\u003c\/p\u003e\n\u003cp\u003eRoyal Canin Labrador Retriever Puppy contains a combination of nutrients with high quality protein (L.I.P.*) and prebiotics (FOS) to support digestive health and balance of intestinal flora. What’s more, they also help to contribute to good stool quality. The kibble in Royal Canin Labrador Retriever Puppy is tailor-made and specially adapted for the Labrador puppy. The shape and size of the kibble makes it easy for your puppy to pick up and chew, whilst the texture enhances its overall palatability.\u003c\/p\u003e\n\u003cdiv class=\"diet-statement\"\u003e\n\u003cdiv aria-hidden=\"false\" role=\"tabpanel\" aria-labelledby=\"ui-id-1\" id=\"ui-id-2\" class=\"acc-answer ui-accordion-content ui-helper-reset ui-widget-content ui-corner-bottom ui-accordion-content-active\"\u003e\n\u003cdiv class=\"benefits\"\u003e\n\u003cp\u003eIngredients: \u003cspan\u003edehydrated poultry protein, maize, vegetable protein isolate, rice, maize flour, animal fats, maize gluten, hydrolysed animal proteins, wheat flour, beet pulp, fish oil, minerals, vegetable fibres, soya oil, fructo-oligo-saccharides (0.34%), psyllium husks and seeds, hydrolysed yeast (source of manno-oligo-saccharides), hydrolysed crustaceans (source of glucosamine), borage oil, yeast extracts (source of betaglucans), marigold extract (source of lutein), hydrolysed cartilage (source of chondroitin).\u003c\/span\u003e\u003cbr\u003e\u003cbr\u003eProtein 33% ; Fat 14%\u003cbr\u003e\u003cbr\u003eSuitable for: Labrador Puppies, up to 15 months of age\u003c\/p\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"benefits\"\u003e\u003c\/div\u003e\n\u003c\/div\u003e\n\u003c\/div\u003e\nSize: 12kg","brand":"Royal Canin","offers":[{"title":"12kg","offer_id":32580046487632,"sku":"43576","price":148.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0484\/0009\/products\/royal-canin-dog-food-puppy-labradorkellyville-pets-552475.jpg?v=1753536987"},{"product_id":"royal-canin-dog-maxi-junior-15kg","title":"Royal Canin Dog Food Puppy Maxi","description":"\u003cp\u003eRoyal Canin Maxi Puppy food contains a patented complex of antioxidants - including the highly beneficial vitamin E - to support your puppy's natural defences while its immune system is immature and still developing. The combination of nutrients that contain high quality protein (such as L.I.P., known for its very high digestibility) as well as prebiotics like FOS help to support your puppy's digestive health Large puppies have a long growth period, that's why they need a diet that accounts for the implications of this period. Fortunately, Royal Canin Maxi Puppy contains a moderate energy level to meet your puppy's energy needs. \u003c\/p\u003e\n\u003cp\u003eIngredients: \u003cspan\u003edehydrated poultry protein, rice, maize flour, vegetable protein isolate, animal fats, maize, wheat flour, hydrolysed animal proteins, beet pulp, maize gluten, minerals, vegetable fibres, soya oil, fish oil, fructo-oligo-saccharides (0.34%), psyllium husks and seeds, hydrolysed yeast (source of manno-oligo-saccharides), yeasts extracts (source of betaglucans), marigold extract (source of lutein), hydrolysed crustaceans (source of glucosamine), hydrolysed cartilage (source of chondroitin).\u003c\/span\u003e\u003cbr\u003e\u003cbr\u003eProtein 30% ; Fat 16%\u003cbr\u003e\u003cbr\u003eSuitable for: Large Breed (adult weight 26-44kg) Puppies, from 2 to 15 months of age\u003c\/p\u003e\n\u003cp\u003eSize: 1kg, 4kg \u0026amp; 15kg\u003cbr\u003e\u003c\/p\u003e","brand":"Royal Canin","offers":[{"title":"15kg","offer_id":32476602171472,"sku":"43536","price":167.2,"currency_code":"AUD","in_stock":true},{"title":"4kg","offer_id":32476602138704,"sku":"43544","price":63.75,"currency_code":"AUD","in_stock":true},{"title":"1kg","offer_id":40423149699152,"sku":"49268","price":20.4,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0484\/0009\/products\/royal-canin-dog-food-puppy-maxikellyville-pets-732771.jpg?v=1753537002"},{"product_id":"royal-canin-dog-medium-junior-15kg","title":"Royal Canin Dog Food Puppy Medium","description":"\u003cp\u003eGrowth is an essential stage in your puppy's life, it's the time of big changes and new discoveries. Because your puppy's immune system is still developing gradually, a specially tailored diet will help your puppy get all the nutrients it needs to grow healthy and strong. Royal Canin Medium Puppy food contains an increased protein content to help support healthy, muscular, and skeletal growth during the relatively short growth period.\u003c\/p\u003e\n\u003cp\u003eAntioxidants are included to support your puppy's natural defences which can be a particular challenge during this life stage. The combination of nutrients containing high quality prebiotics and protein in Royal Canin Medium Puppy food helps to support and maintain your puppy's general digestive health. A group of proteins (L.I.P.) known for their high digestibility have also been included for optimal digestive support.\u003c\/p\u003e\n\u003cp\u003eIngredients: \u003cspan\u003edehydrated poultry protein, maize, animal fats, beet pulp, vegetable protein isolate, maize gluten, dehydrated pork protein*, rice, wheat flour, hydrolysed animal proteins, wheat, maize flour, minerals, fish oil, soya oil, yeasts and parts thereof, fructo-oligo-saccharides (0.34%), hydrolysed yeast (source of manno-oligo-saccharides), yeast extracts (source of betaglucans), marigold extract (source of lutein).\u003c\/span\u003e\u003cbr\u003e\u003cbr\u003eProtein 32% ; Fat 20%\u003cbr\u003e\u003cbr\u003eSuitable for: Medium Breed (adult weight 11-25kg) Puppies, aged 2-12 months of age\u003c\/p\u003e\n\u003cp\u003eSize: 1kg, 4kg \u0026amp; 15kg\u003cbr\u003e\u003c\/p\u003e","brand":"Royal Canin","offers":[{"title":"4kg","offer_id":32476538601552,"sku":"43542","price":60.56,"currency_code":"AUD","in_stock":true},{"title":"15kg","offer_id":32476538634320,"sku":"43564","price":167.2,"currency_code":"AUD","in_stock":true},{"title":"1kg","offer_id":40423150092368,"sku":"49267","price":20.4,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0484\/0009\/products\/royal-canin-dog-food-puppy-mediumkellyville-pets-602296.jpg?v=1753537017"},{"product_id":"royal-canin-dog-mini-junior-8kg","title":"Royal Canin Dog Food Puppy Mini","description":"\u003cp\u003eYour puppy's growth period is such an essential stage in its life; it's the time of big changes and new discoveries. Within this period, your puppy's immune system is developing gradually. That's why Royal Canin Mini Puppy contains a complex of antioxidants - including vitamin E - to help support your puppy's natural defences as it grows. The shape of the kibble is small and easy to chew, perfect for your puppy's small mouth, and both the smell and flavour are optimised to tempt even the fussiest of dogs; it also helps to support its dental health and general oral hygiene.\u003c\/p\u003e\n\u003cp\u003eBy containing a combination of nutrients with high quality protein (such as L.I.P - known for its high digestibility) as well as prebiotics, Royal Canin Mini Puppy supports the digestive health and balance of intestinal flora, which contributes to good stool quality by reducing faecal smell and quantity.\u003c\/p\u003e\n\u003cp\u003eIngredients: \u003cspan\u003e dehydrated poultry protein, rice, animal fats, vegetable protein isolate, maize, beet pulp, maize flour, hydrolysed animal proteins, maize gluten, minerals, fish oil, soya oil, fructo-oligo-saccharides (0.34%), hydrolysed yeast (source of manno-oligo-saccharides), yeast extracts (source of betaglucans), marigold extract (source of lutein). \u003c\/span\u003e\u003cbr\u003e\u003cbr\u003eProtein 31% ; Fat 20%\u003cbr\u003e\u003cbr\u003eSuitable for: Small Breed Puppies (adult weight up to 10kg) from 2-10 months of age\u003c\/p\u003e\n\u003cp\u003eSize: 800g, 2kg, 4kg \u0026amp; 8kg \u003cbr\u003e\u003c\/p\u003e","brand":"Royal Canin","offers":[{"title":"2kg","offer_id":32476346679376,"sku":"43570","price":39.1,"currency_code":"AUD","in_stock":true},{"title":"8kg","offer_id":32476346712144,"sku":"43594","price":109.01,"currency_code":"AUD","in_stock":true},{"title":"4kg","offer_id":39271663796304,"sku":"43753","price":68.0,"currency_code":"AUD","in_stock":true},{"title":"800g","offer_id":40423150321744,"sku":"49265","price":16.58,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0484\/0009\/products\/royal-canin-dog-food-puppy-minikellyville-pets-839929.jpg?v=1753537034"},{"product_id":"royal-canin-dog-maxi-german-shepard-junior-12kg","title":"Royal Canin Dog Food Puppy German Shepherd","description":"\u003cp\u003eRoyal Canin German Shepherd Junior is tailor-made to suit the unique nutritional needs of your German Shepherd puppy. This premium dry puppy food is formulated specifically to support the growth and development of German Shepherd puppies. Royal Canin German Shepherd Junior is rich in antioxidants and prebiotics to support your puppy’s natural immune defences and is made from highly digestible ingredients to help prevent digestive problems, flatulence and bad stool odour. It has an exclusive kibble size, shape and texture made specifically to suit the German Shepherds jaw and also has an adapted calcium and phosphorus content to support optimal bone and joint development.\u003c\/p\u003e\n\u003cp\u003eIngredients: \u003cspan\u003edehydrated poultry protein, rice, vegetable protein isolate*, wheat flour, maize flour, animal fats, hydrolysed animal proteins, beet pulp, vegetable fibres, fish oil, minerals, soya oil, fructo-oligo-saccharides (0.34%), psyllium husks and seeds, hydrolysed yeast (source of manno-oligo-saccharides: 0.05%), hydrolysed crustaceans (source of glucosamine), yeast extracts (source of betaglucans), marigold extract (source of lutein), hydrolysed cartilage (source of chondroitin). \u003c\/span\u003e\u003cbr\u003e\u003cbr\u003eProtein 30% ; Fat 16%\u003cbr\u003e\u003cbr\u003eSuitable for: German Shepherd Puppies, up to 15 months of age\u003cbr\u003e\u003c\/p\u003e\n\u003cp\u003eSize: 12kg \u003c\/p\u003e","brand":"Royal Canin","offers":[{"title":"12kg","offer_id":32580045930576,"sku":"47005","price":148.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0484\/0009\/products\/royal-canin-dog-food-puppy-german-shepherdkellyville-pets-104205.jpg?v=1753537063"},{"product_id":"dermcare-aloveen-oatmeal-conditioner-500ml","title":"Dermcare Aloveen Conditioner Oatmeal","description":"\u003cp\u003eGentle, hypoallergenic shampoo and conditioner that is perfect for animals with sensitive and normal skin. For use on pets with atopic and contact dermatitis. For owners who wish to use natural remedies.\u003c\/p\u003e\n\u003cp\u003eSize: 200mL \u0026amp; 500mL\u003c\/p\u003e","brand":"Dermcare","offers":[{"title":"500mL","offer_id":32522334928976,"sku":"41648","price":61.99,"currency_code":"AUD","in_stock":true},{"title":"200mL","offer_id":32522334896208,"sku":"47879","price":26.49,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0484\/0009\/products\/dermcare-aloveen-conditioner-oatmealkellyville-pets-115471.jpg?v=1753537078"},{"product_id":"dermcare-aloveen-oatmeal-shampoo-1l","title":"Dermcare Aloveen Shampoo Oatmeal","description":"\u003cp\u003eGentle, hypoallergenic shampoo and conditioner that's perfect for animals with sensitive and normal skin. For use on pets with atopic and contact dermatitis whose owners wish to use natural remedies.\u003c\/p\u003e\n\u003cp\u003eSize: 250mL, 500mL \u0026amp; 1L\u003c\/p\u003e","brand":"Dermcare","offers":[{"title":"1L","offer_id":32522382737488,"sku":"41643","price":59.99,"currency_code":"AUD","in_stock":true},{"title":"250mL","offer_id":32522382671952,"sku":"42586","price":22.99,"currency_code":"AUD","in_stock":true},{"title":"500mL","offer_id":32522382704720,"sku":"47872","price":39.99,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0484\/0009\/products\/dermcare-aloveen-shampoo-oatmealkellyville-pets-252482.jpg?v=1753537081"},{"product_id":"dermcare-aloveen-starter-pack","title":"Dermcare Aloveen Shampoo \u0026 Conditioner Starter Pack","description":"\u003ctable border=\"0\" cellpadding=\"0\" cellspacing=\"0\" width=\"100%\"\u003e\n\u003ctbody\u003e\n\u003ctr\u003e\n\u003ctd\u003e\n\u003cp\u003eAloveen is a gentle, hypoallergenic shampoo and conditioner perfect for animals with sensitive and normal skin. This pack contains both the Shampoo 250ml and Conditioner 100ml (Duo Pack). \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eProduct details\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eRecommended for use on pets any age with atopic and contact dermatitis and for owners who wish to use natural remedies\u003c\/li\u003e\n\u003cli\u003econtains 2% oatmeal extract - a stabilised suspension of superfine colloidal oatmeal, renowned for its soothing, anti-itch properties.\u003c\/li\u003e\n\u003cli\u003ealso contains: an emollient and cooling aloe vera gel\u003c\/li\u003e\n\u003cli\u003eshampoo contains a gently cleansing shampoo base, which removes dirt, chemicals and allergens from the coat without irritating the skin\u003c\/li\u003e\n\u003cli\u003eshampoo also contains superfine colloidal oatmeal, in a stable suspension that doesn't separate out and guarantees an even dose throughout the life of the bottle\u003c\/li\u003e\n\u003cli\u003eintensive conditioner is a unique, concentrated residual conditioner, specifically designed as a leave on product for deeper conditioning, and to prolong the soothing effects of the shampoo\u003c\/li\u003e\n\u003cli\u003econditioner restores natural skin moisture leaving a glossy, tangle-free coat with a warm pleasant fragrance.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003c\/tbody\u003e\n\u003c\/table\u003e","brand":"Dermcare","offers":[{"title":"Default Title","offer_id":709013219,"sku":"41645","price":37.49,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0484\/0009\/products\/dermcare-aloveen-shampoo-conditioner-starter-packkellyville-pets-375565.jpg?v=1753537085"},{"product_id":"capstar-11mg-cats-small-dogs","title":"Capstar Tablets for Cats and Small Dogs Blue - 6 Pack","description":"\u003cp\u003eCapstar is a fast acting tablet that starts killing fleas within just 30 minutes! \u003cbr\u003e\u003cbr\u003eCapstar offers rapid and effective relief from fleas and should be used any day you find fleas on your cat or dog. Delivered in a small tablet, Capstar won’t rub or wash off, or leave a messy residue on your pet. Capstar has a rapid onset of action – it starts killing fleas within 30 minutes, and continues to rapidly kill fleas for 24 hours. Treatment can begin on any day when fleas are seen on the animal, and repeated on any subsequent day fleas are present. Capstar should be given orally, with or without food.\u003cbr\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eSmall, easy to administer tablet\u003c\/li\u003e\n\u003cli\u003eStarts killing adult fleas within 30 minutes of dosing\u003c\/li\u003e\n\u003cli\u003eAdminister on any day fleas are evident on your pet\u003c\/li\u003e\n\u003cli\u003eFor use in dogs and cats from 4 weeks of age and 0.5kg\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eNote: If a continuous flea infestation is observed after using Capstar, the attending veterinarian should be consulted for further advice.\u003cbr\u003e\u003cbr\u003eCapstar is safe to use in puppies and kittens from 4 weeks of age, and in pregnant bitches and queens.\u003cbr\u003e\u003cbr\u003eDog\/cat weight : \u003cspan\u003eCapstar dose\u003c\/span\u003e\u003cbr\u003e\u003cbr\u003e\u003cstrong\u003e0.5-11kg\u003c\/strong\u003e: 1 x small (11.4mg) tablet, on any day when fleas are seen on the animal\u003cbr\u003e\u003cstrong\u003e11.1-57kg:\u003c\/strong\u003e 1 x large (57mg) tablet, on any day when fleas are seen on the animal\u003cbr\u003e\u003cstrong\u003e\u0026gt;57.1kg:\u003c\/strong\u003e 1 x large (57mg) + 1 x small (11.4mg) tablet for every 11kg more than 57kg, on any day when fleas are seen on the animal\u003cbr\u003e\u003c\/p\u003e","brand":"Capstar","offers":[{"title":"Default Title","offer_id":41229660356688,"sku":"47805","price":33.99,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0484\/0009\/products\/capstar-flea-treatment-tabletkellyville-pets-577177.png?v=1753537088"},{"product_id":"virbac-cetrigen-100g","title":"Virbac Cetrigen Antibacterial Spray","description":"\u003cp\u003eCetrigen is formulated to treat cuts and superficial wounds in all animals. The product formulation contains an antibacterial agent, an insect repellent and a purple dye colouring to clearly indicate coverage of the intended site.\u003c\/p\u003e\n\u003cp\u003ePlease note: This product will mark your pet's fur when applied.\u003c\/p\u003e\n\u003cp\u003eSize: 100g \u003c\/p\u003e","brand":"Virbac","offers":[{"title":"100g","offer_id":32576925040720,"sku":"41970","price":35.99,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0484\/0009\/products\/virbac-cetrigen-antibacterial-spraykellyville-pets-948276.jpg?v=1753537091"},{"product_id":"dog-rocks-600g","title":"Dog Rocks","description":"\u003cp\u003eDog Rocks are a 100% Natural Australian product that will save your lawn from those nasty burn patches that your Dog's urine can cause.\u003cbr\u003e\u003cbr\u003eDog Rocks filter out impurities from water such as Tin, ammonia and nitrates. These impurities are usually passed out through urine, and when grass comes in contact with these elements it results in urine burn on grass, resulting in a dead, yellow patch on your lawn.\u003cbr\u003e\u003cbr\u003eDog Rocks give your four legged friend a cleaner source of water, while eliminating urine burn on grass this will result in the stop of those nasty burnt yellow patches on your lawn. Without the impurities in the water, Dog Rocks actually help your dog fertilize your lawn! This is great for you, your dog \u0026amp; your lawn!\u003c\/p\u003e\n\u003cp\u003eSize: 200g \u0026amp; 600g\u003c\/p\u003e","brand":"Dog Rocks","offers":[{"title":"200g","offer_id":32526755659856,"sku":"47909","price":17.99,"currency_code":"AUD","in_stock":true},{"title":"600g","offer_id":32526755692624,"sku":"47910","price":37.99,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0484\/0009\/products\/Dog-Rocks_-Kellyville-Pets-5444733.png?v=1773936137"},{"product_id":"drontal-allwormer-3kg-dog-4-tabs","title":"Drontal Allwormer Tablet for Small Dogs \u0026 Puppies 3kg Green - 4 Pack","description":"\u003cp\u003eGentle, effective control of all 11 gastrointestinal worms Roundworm, hookworm, whipworm, tapeworm (including hydatid) Does not control heartworm in dogs. Safe for all dogs including old animals, young pups, working dogs and greyhounds. In pregnant bitches it should be given only in the last 10 days prior to whelping. Directions for use: Given as a single dose by mouth. Fasting prior is not necessary.\u003c\/p\u003e\n\u003cp\u003eHydatid Tapeworm: Dogs should be treated every 6 weeks to ensure that newly acquired hydatid tapeworm are expelled before reaching maturity. Hunting dogs that eat offal require hydatid tapeworm treatment. It should be noted that hydatid tapeworm poses a severe risk to human health by transmission to humans from infected dogs.\u003c\/p\u003e\n\u003cp\u003eHookworms \u0026amp; roundworms: Dogs \u0026amp; Puppies: treat at 2, 4, 8 and 12 weeks and then every month until 6 months of age; thereafter every 3 months or on vet advice.\u003c\/p\u003e\n\u003cp\u003eWhipworm \u0026amp; Tapeworm: Treat every 6 months except in hydatid tapeworm areas where every 6 weeks is recommended.\u003c\/p\u003e\n\u003cp\u003ePregnant bitches: treat prior to mating, then 10 days before whelping and at 2 and 4 weeks after whelping.\u003c\/p\u003e\n\u003cp\u003eOne tablet treats 3kg.\u003c\/p\u003e","brand":"Drontal","offers":[{"title":"Default Title","offer_id":41229650788432,"sku":"41640","price":19.54,"currency_code":"AUD","in_stock":false}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0484\/0009\/products\/drontal-worming-tablet-for-dogskellyville-pets-364366.jpg?v=1753537104"},{"product_id":"drontal-chewable-10kg-dog-2pk","title":"Drontal Allwormer Chewable for Dogs 10kg Blue","description":"\u003cp\u003eDo you ever wonder if there was one magic chewable dog worming tablet that could do it all? One chewable dog worming tablet to \u003cem\u003erule\u003c\/em\u003e them all? One chewable dog worming tablet that could kill \u003cem\u003eevery\u003c\/em\u003e type of intestinal worm found in Australian dogs? Such intestinal worms like roundworm, hookworm, whipworm and tapeworm? Even hydatid tapeworm?  Well here \u003cem\u003eit\u003c\/em\u003e is! \u003cstrong\u003eDrontal for Dogs Allwormer Chewable\u003c\/strong\u003e.\u003cbr\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cbr\u003eDrontal for Dogs Allwormer Chewable is a delectable \u003cem\u003emeaty\u003c\/em\u003e dog worming chew to control and protect your dog from worms. Drontal dog worming chews not only protect your dog from worms, but it also kills \u003cem\u003eevery\u003c\/em\u003e type of intestinal worm found in Australian dogs! Including roundworm, hookworm, whipworm and tapeworm (including hydatid tapeworm). So when treating your pet with Drontal Dog Worming Chewables and Tablets, it'll also provide protection for the whole family from gastrointestinal parasites as well!\u003cbr\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003e\u003cspan style=\"line-height: 1.4;\"\u003eDrontal is a meaty \u0026amp; chewable \u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan style=\"line-height: 1.4;\"\u003eDrontal has a formulation of three distinctly different proven drugs offering a broad spectrum of activity. \u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan style=\"line-height: 1.4;\"\u003eThe febantel\/pyrantel combination is active against roundworms and is highly effective against whipworms. \u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan style=\"line-height: 1.4;\"\u003ePraziquantel provides a superb level of efficiency against all the major tapeworms. \u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan style=\"line-height: 1.4;\"\u003eYour dog won't need to fast before taking Drontal unlike other wormers. \u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003eDrontal is so safe it can be used on puppies from 2 weeks old. \u003c\/li\u003e\n\u003cli\u003eDrontal can also be combined with other heartworm prevention and flea or tick treatments such as Advantage for dogs or Advantix for dogs. \u003c\/li\u003e\n\u003cli\u003eMade with real liver.\u003c\/li\u003e\n\u003cli\u003eDrontal Chewables come with a flavour guarantee - if your dog doesn't love the taste you'll receive a Drontal tablet free.\u003c\/li\u003e\n\u003cli\u003eWith Drontal, worms are no longer a worry for you or your pet!\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cstrong\u003eDrontal Allwormer is the only Allwormer registered to control Giardia in Dogs.\u003c\/strong\u003e \u003cbr\u003e(Refer to Vet Recommendations for further information).\u003cbr\u003e\u003cbr\u003eGiardiasis refers to an intestinal infection that is caused by the protozoan parasite giardia, which is the most common intestinal parasite that is found in humans. Dogs develop the infection by ingesting infectious offspring (cysts) that are shed in another animal's faeces. The contamination can be from direct or indirect contact with the infected cysts. The organisms, once ingested, make their way into the intestine, often causing diarrhoea.\u003cbr\u003e\u003cbr\u003e\u003cstrong\u003eDrontal Chewables is available in two sizes:\u003c\/strong\u003e\u003cbr\u003e\u003cbr\u003e- \u003cstrong\u003eMedium\u003c\/strong\u003e dog chews for puppies and dogs up to 10 kg. \u003cbr\u003e- \u003cstrong\u003eLarge\u003c\/strong\u003e dog chews for dogs up to 35 kg. \u003cbr\u003e\u003cem\u003e(Dogs over 35kg are given a combination of the chews).\u003c\/em\u003e\u003cbr\u003e\u003cstrong\u003e\u003c\/strong\u003e\u003c\/p\u003e","brand":"Drontal","offers":[{"title":"5 Pack","offer_id":32517702189136,"sku":"41638","price":45.04,"currency_code":"AUD","in_stock":true},{"title":"2 Pack","offer_id":41228649627728,"sku":"47938","price":23.79,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0484\/0009\/products\/drontal-chewable-worming-tablets-for-dogskellyville-pets-145212.jpg?v=1753537104"},{"product_id":"drontal-puppy-wormer-30ml","title":"Drontal Worming Suspension for Puppies - 30mL","description":"\u003cp\u003eDrontal Worming Suspension is recommended for the control of gastrointestinal worms in puppies and small dogs including Roundworm, Hookworm, Whipworm. This product does not control Tapeworms or heartworms.\u003cbr\u003e\u003cbr\u003eRoundworms and Hookworms:\u003cbr\u003e\u003cbr\u003eThese parasites infect puppies while still in the mother's womb or as soon as they suckle the milk. Hookworms are bloodsuckers and in large numbers are capable of causing anaemia and death, particularly in puppies.\u003cbr\u003eDue to the life cycle of these worms it is important to treat puppies frequently until at least 12 weeks of age. Both worms can also infect dogs of any age by ingestion of worm eggs and larvae can also penetrate through the skin.\u003cbr\u003eTo reduce general environment contamination by eggs and larvae from the bitch during pregnancy, pregnant bitches should be treated routinely prior to mating, and at the end of pregnancy and during lactation.\u003cbr\u003e\u003cbr\u003eWhipworms:\u003cbr\u003e\u003cbr\u003eThis parasite lives in the large intestine and is transmitted by the eggs, passed onto the ground by one dog, being ingested by another dog. The eggs are extremely resistant and long lasting. It is important to treat every 6-8 weeks after 3 months of age to prevent re-infestation.\u003cbr\u003e\u003cbr\u003eWorms often re-infest pups so it is necessary to treat the puppy itself and all other contact dogs, reduce environmental contamination by daily disposal of droppings.\u003cbr\u003e\u003c\/p\u003e","brand":"Drontal","offers":[{"title":"Default Title","offer_id":41228623446096,"sku":"41536","price":30.59,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0484\/0009\/products\/drontal-puppy-wormerkellyville-pets-614948.png?v=1753537107"},{"product_id":"durapet-stainless-steel-dog-bowl-4-2l","title":"Durapet Stainless Steel Non Slip Dog Bowl","description":"\u003cp\u003eThe quality, heavy gauge stainless steel makes Durapet Premium Stainless Steel Pet Bowls extremely durable and hygienic, while the weight lends more stability. The unique fused vinyl ring along the base offers multiple advantages, including skid resistance, ensuring the bowl does not slide while the pet is eating.\u003c\/p\u003e\n\u003cp\u003eSize: 350mL, 550mL, 1.1L, 1.85L, 2.75L \u0026amp; 3.8L\u003c\/p\u003e","brand":"Zeez","offers":[{"title":"350mL","offer_id":32690104893520,"sku":"47370","price":11.49,"currency_code":"AUD","in_stock":true},{"title":"550mL","offer_id":32690104926288,"sku":"47371","price":13.99,"currency_code":"AUD","in_stock":true},{"title":"1.85L","offer_id":32690104991824,"sku":"47373","price":22.49,"currency_code":"AUD","in_stock":true},{"title":"3.8L","offer_id":32690105057360,"sku":"47375","price":33.99,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0484\/0009\/products\/durapet-stainless-steel-non-slip-dog-bowlkellyville-pets-674939.jpg?v=1753537110"},{"product_id":"virbac-epi-otic-237ml","title":"Virbac Epi-Otic Ear \u0026 Skin Cleanser","description":"\u003cp\u003eEpiOtic® SIS. Gentle Yet Powerful.\u003cbr data-mce-fragment=\"1\"\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA gentle, pH balanced ear cleanser which aids in the removal of wax and reduces odour\u003c\/li\u003e\n\u003cli\u003eKills and inhibits the growth of infectious agents associated with otitis externa\u003c\/li\u003e\n\u003cli\u003eFacilitates the delivery of prescribed ear medications\u003c\/li\u003e\n\u003cli\u003eProven microbicidal action against Australian clinical isolates, including MRSP\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eRecommended for ear cleansing or for the management or prevention of otitis externa in dogs.\u003c\/p\u003e\n\u003cp\u003eActive constituents: 5mg\/mL Disodium EDTA \u0026amp; 2mg\/mL Salicyclic Acid\u003c\/p\u003e\n\u003cp\u003eDirections for use: A veterinary examination to assess the ears and general health of the dog is recommended before use. EpiOtic SIS can be applied up to twice daily or as directed by a veterinarian. For routine use: aim the tip of the bottle into the ear canal and squeeze to apply solution. Gently massage the ear.\u003c\/p\u003e\n\u003cp\u003eSize: 237ml \u0026amp; 120mL\u003c\/p\u003e","brand":"Virbac","offers":[{"title":"120mL","offer_id":42368822673488,"sku":"49071","price":31.99,"currency_code":"AUD","in_stock":true},{"title":"237mL","offer_id":32526674919504,"sku":"49072","price":49.99,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0484\/0009\/files\/virbac-epi-otic-ear-skin-cleanserkellyville-pets-958865.jpg?v=1753537113"},{"product_id":"ezydog-car-restraint","title":"EzyDog Car Restraint","description":"\u003cp\u003eRoad trips can be a blast, but not when your dog is climbing all over the passengers! This Seat Belt Restraint attaches to the D-Ring of your dog's harness to keep them restrained, whilst still letting them sit or lay down comfortably. Keep your pet safe with a law abiding car trip every time!\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eOnly for use with a correct fitting harness. Never attach a car tethering restraint to your dogs collar.\u003c\/strong\u003e\u003c\/p\u003e","brand":"EzyDog","offers":[{"title":"Default Title","offer_id":709023395,"sku":"47579","price":12.95,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0484\/0009\/products\/ezydog-car-restraintkellyville-pets-522792.jpg?v=1753537119"},{"product_id":"frontline-spray-100ml","title":"Frontline Flea and Tick Spray for Cats and Dogs","description":"\u003cp\u003eFrontline Spray controls fleas and ticks, and can be used on puppies and kittens from 2 days of age.\u003cbr\u003e\u003cbr\u003eFrontline Spray provides your dog with protection against fleas and ticks in the following ways:\u003cbr\u003e- Controls Brown Dog ticks when applied monthly.\u003cbr\u003e- Controls Paralysis ticks when applied every 3 weeks on cats and dogs\u003cbr\u003e- Controls adult fleas when applied every 4 to 12 weeks.\u003cbr\u003e- Controls Flea Allergy Dermatitis when applied monthly to the affected pet. \u003cbr\u003e- All other dogs and cats in the household should be routinely treated too.\u003cbr\u003e\u003c\/p\u003e","brand":"Frontline","offers":[{"title":"100mL","offer_id":709025535,"sku":"41732","price":45.89,"currency_code":"AUD","in_stock":true},{"title":"250mL","offer_id":28171267539024,"sku":"41733","price":81.59,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0484\/0009\/products\/frontline-flea-and-tick-spray-for-cats-and-dogskellyville-pets-174635.jpg?v=1753537135"},{"product_id":"furminator-large-short-hair-dog-deshedding-tool-large","title":"FURminator for Dogs","description":"\u003cp\u003eThe Furminator deShedding tool reduces loose hair from shedding up to 90% with regular use \u003cbr\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eRemoves the loose hair from shedding\u003c\/li\u003e\n\u003cli\u003eCurved edge for comfortable, effective loose undercoat hair removal\u003c\/li\u003e\n\u003cli\u003eReaches through topcoat to remove loose undercoat hair\u003c\/li\u003e\n\u003cli\u003eErgonomic handle for comfort and ease of use\u003c\/li\u003e\n\u003cli\u003eCurved edge – comfortably follows pet's natural shape\u003c\/li\u003e\n\u003cli\u003eFURejector® button to quickly and easily release collected hair\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eSize: Small, Medium \u0026amp; Large for Short or Long Hair\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003e*As product is transitioning to a new design, it may be different to picture shown*\u003c\/span\u003e\u003c\/p\u003e","brand":"Furminator","offers":[{"title":"Small \/ Short Hair","offer_id":32525806764112,"sku":"42724","price":74.99,"currency_code":"AUD","in_stock":true},{"title":"Medium \/ Short Hair","offer_id":32525806796880,"sku":"42725","price":89.99,"currency_code":"AUD","in_stock":true},{"title":"Large \/ Short Hair","offer_id":32525806829648,"sku":"42726","price":89.99,"currency_code":"AUD","in_stock":true},{"title":"Small \/ Long Hair","offer_id":39623071367248,"sku":"47147","price":74.99,"currency_code":"AUD","in_stock":true},{"title":"Medium \/ Long Hair","offer_id":39623071400016,"sku":"47148","price":89.99,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0484\/0009\/products\/furminator-for-dogskellyville-pets-494221.jpg?v=1753537135"},{"product_id":"troy-iodin-spray-500ml","title":"Troy Iodin Spray","description":"\u003cp\u003eTroy Iodin Spray is a skin and wound dressing for cuts, abraisions, ringworm, and skin disinfection before surgery or injections, disinfection of the naval, castration and docking wounds, skin infections due to bacteria \u0026amp; fungi, cut teats and other wounds.\u003c\/p\u003e\n\u003cp\u003eSize: 500mL\u003c\/p\u003e","brand":"Troy","offers":[{"title":"500mL","offer_id":32576986873936,"sku":"47896","price":39.99,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0484\/0009\/products\/troy-iodin-spraykellyville-pets-699907.jpeg?v=1753537159"},{"product_id":"kong-puppy-small","title":"KONG Puppy Dog Toy","description":"\u003cp\u003eThe KONG Puppy toy is the original toy that started the KONG Puppy product line made with our exclusive teething rubber formula. Veterinarians and trainers recommend stuffing the KONG Puppy with KONG Easy Treat, Snacks or Ziggies to aid in crate training, decrease separation anxiety, promote proper chewing behaviour and deter misbehaviour.\u003c\/p\u003e\n\u003cp\u003eSize: Small, Medium \u0026amp; Large\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003ePlease Note-This item comes in blue or pink. if you would like a specific colour please leave your requirements in the notes section during check out.\u003c\/span\u003e\u003c\/p\u003e","brand":"KONG","offers":[{"title":"Large","offer_id":32935232700496,"sku":"47949","price":19.99,"currency_code":"AUD","in_stock":true},{"title":"Medium","offer_id":32935232667728,"sku":"47950","price":16.99,"currency_code":"AUD","in_stock":true},{"title":"Small","offer_id":32935232634960,"sku":"47951","price":12.99,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0484\/0009\/products\/kong-puppy-dog-toykellyville-pets-674057.png?v=1753537205"},{"product_id":"troy-laxapet-100g","title":"Troy Laxapet Gel","description":"\u003cp\u003eA mild lubricant laxative softens faeces when used 2 - 3 times per week and aids in the elimination of ingested hair (hair balls) in dogs and cats.\u003c\/p\u003e\n\u003cp\u003eSize: 100g\u003c\/p\u003e","brand":"Troy","offers":[{"title":"100g","offer_id":32576992673872,"sku":"47196","price":21.99,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0484\/0009\/products\/troy-laxapet-gelkellyville-pets-858593.png?v=1753537208"},{"product_id":"ezydog-vario-4-lead-black-185cm","title":"EzyDog Vario 4 Dog Lead - Black","description":"\u003cp\u003eWhile walking you can go from a 185cm leash to a 100cm leash by pulling the leash through the D-ring at the collar end of the leash. Bring the handle back one more time and you now have a 72cm leash.  You can then go back to a 185mm leash by just pulling on the D-ring. It's that easy!\u003c\/p\u003e\n\u003cp\u003eIt also functions as a temporary check collar and can be used as a tether if you want to tie up your dog for a couple of minutes. \u003c\/p\u003e\n\u003cp\u003eSUPER SOFT! \u003c\/p\u003e\n\u003cp\u003eOur own proprietary blend of super soft nylon webbing is the base to this simple but ingenious leash. This leash really is a pleasure to hold, durable and amazingly strong - We then finish it out with reflective trim for night time safety.  \u003c\/p\u003e\n\u003cp\u003eFEATURES: \u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eMultiple functions in a single leash\u003c\/li\u003e\n\u003cli\u003eMade from our Proprietary Soft Touch™ Webbing\u003c\/li\u003e\n\u003cli\u003eStainless steel D-Ring - won't rust!\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eColours available: Black, Blue, Red \u0026amp; Pink Camouflage.\u003c\/p\u003e\n\u003cp\u003eAlso Available in \u003ca href=\"https:\/\/www.kellyvillepets.com.au\/products\/ezydog-vario-4-lite-lead-black-185cm?_pos=4\u0026amp;_sid=5bf65882d\u0026amp;_ss=r\" target=\"_blank\"\u003e\"Lite\"\u003c\/a\u003e Sizing \u003c\/p\u003e","brand":"EzyDog","offers":[{"title":"Default Title","offer_id":41965970587728,"sku":"47580","price":34.95,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0484\/0009\/products\/ezydog-vario-4-dog-leadkellyville-pets-117576.jpg?v=1753537215"},{"product_id":"ezydog-zero-shock-25-lead-black-64cm","title":"EzyDog Zero Shock 25 Dog Lead","description":"\u003cp\u003eThis is definitely an innovation worth shouting about - A high-spec, shock-absorbing webbing dog leash that actually works! We have meticulously designed a highly sprung bungee system that effectively absorbs any sudden shocks made by your dog. Furthermore, it is soft, durable and will not wear over time.  The Zero Shock Leashes combine the ultimate comfort, control and protection, while not compromising on style and quality!\u003c\/p\u003e\n\u003cp\u003eZERO SHOCK™ TECHNOLOGY\u003c\/p\u003e\n\u003cp\u003e\u003cem\u003eZero Shock™ Technology is the advanced shock absorbing component in the centre of the leash that cushions and eases the pressure for both the owner and the dog.\u003c\/em\u003e\u003c\/p\u003e\n\u003cp\u003eSUPER SOFT!\u003c\/p\u003e\n\u003cp\u003eOur own proprietary blend of super soft, double density nylon makes this leash a pleasure to hold and outrageously strong. We then finish it out with reflective trim for night time safety and an additional neoprene lining in the handle.\u003c\/p\u003e\n\u003cp\u003eFEATURES:\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003e'Zero Shock' Technology to protect against sudden jolts \u003c\/li\u003e\n\u003cli\u003eUtilises a Soft Neoprene Lined Loop Handle\u003c\/li\u003e\n\u003cli\u003eMade from our Proprietary Soft Touch™ Webbing\u003c\/li\u003e\n\u003cli\u003eAccessory D-Ring\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eSize: 64cm \u003ca href=\"https:\/\/www.kellyvillepets.com.au\/products\/ezydog-zero-shock-40-lead-black-120cm?_pos=2\u0026amp;_sid=d1ba969f0\u0026amp;_ss=r\" target=\"_blank\"\u003e(Also Available in 120cm)\u003c\/a\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eColours available: Black, Blue, Red, Orange \u0026amp; Pink Camouflage\u003c\/strong\u003e\u003c\/p\u003e","brand":"EzyDog","offers":[{"title":"Black","offer_id":41941522841680,"sku":"42072","price":45.95,"currency_code":"AUD","in_stock":true},{"title":"Blue","offer_id":41941522874448,"sku":"42073","price":45.95,"currency_code":"AUD","in_stock":true},{"title":"Purple","offer_id":41941522907216,"sku":"47634","price":45.95,"currency_code":"AUD","in_stock":true},{"title":"Pink","offer_id":41941522972752,"sku":"61498","price":45.95,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0484\/0009\/products\/ezydog-zero-shock-25-dog-leadkellyville-pets-526902.jpg?v=1753537218"},{"product_id":"ezydog-zero-shock-40-lead-black-120cm","title":"EzyDog Zero Shock 48 Dog Lead","description":"\u003cp\u003eThis is definitely an innovation worth shouting about - A high-spec, shock-absorbing webbing dog leash that actually works! We have meticulously designed a highly sprung bungee system that effectively absorbs any sudden shocks made by your dog. Furthermore, it is soft, durable and will not wear over time.  The Zero Shock Leashes combine the ultimate comfort, control and protection, while not compromising on style and quality!\u003c\/p\u003e\n\u003cp\u003eZERO SHOCK™ TECHNOLOGY\u003c\/p\u003e\n\u003cp\u003e\u003cem\u003eZero Shock™ Technology is the advanced shock absorbing component in the centre of the leash that cushions and eases the pressure for both the owner and the dog.\u003c\/em\u003e\u003c\/p\u003e\n\u003cp\u003eSUPER SOFT!\u003c\/p\u003e\n\u003cp\u003eOur own proprietary blend of super soft, double density nylon makes this leash a pleasure to hold and outrageously strong. We then finish it out with reflective trim for night time safety and an additional neoprene lining in the handle.\u003c\/p\u003e\n\u003cp\u003eTRAFFIC CONTROL\u003c\/p\u003e\n\u003cp\u003e\u003cem\u003eThis extra handle is positioned near your dog’s collar giving you quick and secure control of your dog when required \u003c\/em\u003e(only available on the 48” version)\u003c\/p\u003e\n\u003cp\u003eFEATURES:\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003e'Zero Shock' Technology to protect against sudden jolts \u003c\/li\u003e\n\u003cli\u003eUtilises a Soft Neoprene Lined Loop Handle\u003c\/li\u003e\n\u003cli\u003eMade from our Proprietary Soft Touch™ Webbing\u003c\/li\u003e\n\u003cli\u003eAccessory D-Ring\u003c\/li\u003e\n\u003cli\u003e'Traffic Control' handle located at the end of the leash for when you need close control of your dog\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e Size: 120cm \u003ca href=\"https:\/\/www.kellyvillepets.com.au\/products\/ezydog-zero-shock-25-lead-black-64cm?_pos=1\u0026amp;_sid=d1ba969f0\u0026amp;_ss=r\" target=\"_blank\"\u003e(Also Available in 64cm)\u003c\/a\u003e\u003c\/p\u003e\n\u003cp\u003eColours available: Black, Blue, Red\u003c\/p\u003e","brand":"EzyDog","offers":[{"title":"Black","offer_id":32352929218640,"sku":"42075","price":56.95,"currency_code":"AUD","in_stock":true},{"title":"Blue","offer_id":32352929251408,"sku":"42076","price":56.95,"currency_code":"AUD","in_stock":false},{"title":"Purple","offer_id":41940766294096,"sku":"47642","price":56.95,"currency_code":"AUD","in_stock":true},{"title":"Red","offer_id":32352929284176,"sku":"47643","price":56.95,"currency_code":"AUD","in_stock":true},{"title":"Pink","offer_id":41940758757456,"sku":"61499","price":56.95,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0484\/0009\/products\/ezydog-zero-shock-48-dog-leadkellyville-pets-683743.jpg?v=1753537226"},{"product_id":"troy-nutripet-200g","title":"Troy Nutripet","description":"\u003cp\u003eSometimes, dogs and cats need a little help ensuring they're getting enough vitamins and essential nutrients in their diet. This high-energy vitamin concentrate from Troy's Nutripet range provides an added boost of essential nourishment to supplement balanced diets. This formula contains a combination of vitamins crucial for healthy development, along with added calcium, magnesium and proteins.\u003c\/p\u003e\n\u003cp\u003eSize: 200g\u003c\/p\u003e","brand":"Troy","offers":[{"title":"200g","offer_id":32576999817296,"sku":"47383","price":29.99,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0484\/0009\/products\/troy-nutripetkellyville-pets-571774.jpg?v=1753537230"},{"product_id":"petsafe-outdoor-bark-control-deterrent","title":"PetSafe Outdoor Bark Control Deterrent","description":"\u003cp\u003eIf your neighbour's dog is driving you bonkers with his barking, help is here! Our ultrasonic Outdoor Bark Control unit looks like any ordinary birdhouse that can hang in a tree, on a fence post, or anywhere outside. It detects barking from up to 15 metres away and has 3 range settings. Whenever your dog – or your neighbour's dog – barks, he will hear a safe, high-pitched sound (inaudible to humans) that will cue him to stop his annoying habit.\u003c\/p\u003e","brand":"PetSafe","offers":[{"title":"Default Title","offer_id":709037295,"sku":"49155","price":175.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0484\/0009\/products\/petsafe-outdoor-bark-control-deterrentkellyville-pets-205535.jpg?v=1753537232"},{"product_id":"troy-puppy-kitten-worm-syrup-50ml","title":"Troy Puppy \u0026 Kitten Worm Syrup - 50mL","description":"\u003cp\u003e\u003cspan\u003eTroy Puppy and Kitten Worming Syrup will help you protect young puppies and kittens against round worms. Containing the active ingredient piperazine, this all wormer is safe for use in puppies and kittens, as well as adult dogs, cats, and guinea pigs\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003ePlease note: this product only treats roundworm, not all intestinal worms.\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003e\u003cstrong\u003eDirections for use\u003c\/strong\u003e  \u003cbr\u003e1mL per kg bodyweight, given for 2 consecutive days.  \u003cbr\u003e\u003cbr\u003eCats: treat at 6, 8 and 12 weeks, thereafter every 3 months.\u003cbr\u003e\u003cbr\u003eDogs \u0026amp; Guinea Pigs: Treat at 2, 4, 8 and 12 weeks, thereafter every 3 months\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSize:\u003c\/strong\u003e\u003cspan\u003e Syrup 50ml\u003c\/span\u003e\u003c\/p\u003e","brand":"Troy","offers":[{"title":"Default Title","offer_id":41229680705616,"sku":"47293","price":16.15,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0484\/0009\/products\/troy-puppy-kitten-worm-syrupkellyville-pets-752857.png?v=1753537239"},{"product_id":"thundershirt-xsmall-13-18","title":"Thunderworks ThunderShirt for Dogs","description":"\u003cp\u003eThunderShirt uses gentle hugging to calm your dog during a storm or thunder. With its patented design, ThunderShirt's gentle, constant pressure has a dramatic calming effect for most dogs if they are anxious, fearful or overexcited. Based on surveys completed by over two thousand customers, over 80% of dogs show significant improvement in symptoms when using ThunderShirt.\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003eMany dogs get scared and suffer anxiety at times of stress and travelling or when there are storms and thunder.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003eThunderShirt is already helping hundreds of thousands of dogs around the world and is recommended by thousands of veterinarians and trainers. How does ThunderShirt work? Experts believe that pressure has a calming effect on the nervous system, possibly by releasing a calming hormone like endorphins. Using pressure to relieve anxiety in people and animals has been a common practice for years.\u003c\/p\u003e\n\u003cp\u003eSize: Small (16-23\"), Medium (18-26\"), Large (24-32\") \u0026amp; X-\u003cspan data-mce-fragment=\"1\"\u003eLarge (31-40\")\u003c\/span\u003e.\u003c\/p\u003e","brand":"Thundershirt","offers":[{"title":"X-Small","offer_id":42323210731600,"sku":"42161","price":71.99,"currency_code":"AUD","in_stock":true},{"title":"Small","offer_id":32920171020368,"sku":"42162","price":73.99,"currency_code":"AUD","in_stock":true},{"title":"Medium","offer_id":32920171053136,"sku":"42163","price":73.99,"currency_code":"AUD","in_stock":true},{"title":"Large","offer_id":32920171085904,"sku":"42164","price":73.99,"currency_code":"AUD","in_stock":true},{"title":"X-Large","offer_id":40481592115280,"sku":"42165","price":73.99,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0484\/0009\/products\/thunderworks-thundershirt-for-dogskellyville-pets-414230.jpg?v=1753537250"},{"product_id":"urine-off-dog-puppy-500ml","title":"Urine Off Dog \u0026 Puppy Formula","description":"\u003cp\u003eUrine Off Dog \u0026amp; Puppy Formula is a veterinarian-recommended product for canine urine odour and stain removal. Urine Off Dog \u0026amp; Puppy Formula uses bio-enzymatic technology to permanently eliminate your dog or puppy’s urine stains and odours from virtually any surface. The combination of micro-organisms and their enzymes in the non-pathogenic bacteria work together to breakdown the uric acid that produces urine’s pungent aroma and the urea that sticks to the surface, effectively removing all components of the urine, when used as directed. Urine Off is a USDA Certified Biobased Product and holds the Carpet and Rug Institute’s Seal of Approval. Urine Off is safe to use around pets and people.\u003c\/p\u003e\n\u003cp\u003eSize: 118mL, 500mL \u0026amp; 946mL\u003c\/p\u003e","brand":"Urine-Off","offers":[{"title":"500mL","offer_id":32526886469712,"sku":"49850","price":38.99,"currency_code":"AUD","in_stock":true},{"title":"946mL","offer_id":32526886535248,"sku":"49851","price":49.99,"currency_code":"AUD","in_stock":true},{"title":"118mL","offer_id":32530654888016,"sku":"49904","price":15.99,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0484\/0009\/products\/urine-off-dog-puppy-formulakellyville-pets-499315.jpg?v=1753537254"},{"product_id":"australian-pet-treats-beef-liver-150g","title":"Evolution Australian Pet Treats Beef Liver Dog Treat","description":"\u003cp\u003eAustralian Pet Treat Company’s Beef Liver Dog Treats are made with 100% Australian Beef Liver. The only ingredient you will find listed in this meat dog treat is pure meat that’s been thinly sliced and dehydrated to create a meat dog treat that is crunchy and irresistible.\u003c\/p\u003e\n\u003cp\u003eThis delicious treat delivers 60.4% protein and provides all the flavour your dog craves. Beef Liver is a delicious, high protein treat that you can take anywhere for rewards on the go, or they can be broken into bite-size pieces for smaller dogs and puppies, or to assist with your training regime.\u003c\/p\u003e\n\u003ch4\u003eIngredients: \u003c\/h4\u003e\n\u003cp\u003e\u003cspan\u003e100% Australian Beef Liver\u003c\/span\u003e\u003c\/p\u003e\n\u003ch4\u003e\u003cspan\u003eTypical Analysis: \u003c\/span\u003e\u003c\/h4\u003e\n\u003cp\u003e\u003cspan\u003eCrude Protein: 60.4%, Crude Fat: 17.2%, Crude Fibre: \u0026lt;0.1%, Sodium: 0.8%, ME 361 kcal\/100g\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003eSize: 150g\u003c\/p\u003e","brand":"Australian Pet Treats","offers":[{"title":"150g","offer_id":32577047101520,"sku":"45123","price":12.99,"currency_code":"AUD","in_stock":false}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0484\/0009\/files\/evolution-australian-pet-treats-beef-liver-dog-treatkellyville-pets-236358.png?v=1753537433"},{"product_id":"black-hawk-puppy-lamb-rice-20kg","title":"Black Hawk Dog Food Puppy Medium Breed Lamb \u0026 Rice","description":"\u003cp\u003eMade with Australian grass fed lamb, a highly digestible protein source rich in iron and vitamin B12 for strong muscles, healthy bones, and vitality. This balanced high-quality diet also contains chicory root, a natural prebiotic superfood that helps support intestinal health and reduce food sensitivities.\u003cbr\u003e\u003cbr\u003eDelicious fruit duo blueberries and cranberries rich in antioxidants may help immunity and natural defences, while rosemary a highly effective natural preservative may improve cell function. A blend of Australian sourced rice and oats helps provide energy to the developing body and brain.\u003cbr\u003e\u003cbr\u003eBlack Hawk Original Lamb \u0026amp; Rice Medium Breed Puppy kibble is sized to suit and encourage healthier eating and chewing at mealtimes.\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003eIngredients: Lamb meal, rice, chicken meal, pork meal, pork fat, oats, chickpeas, faba beans, hydrolysed chicken protein, beet pulp, chicken digest, fish oil, essential vitamins and minerals (see tables), sweet potato, pumpkin, chicory root, natural yeast extracts, sea kelp, tomato, Yucca schidigera extract, natural antioxidants, algae β-glucan, D-glucosamine, emu oil, green-lipped mussel, blueberries, carrots, cranberries, dandelion, peppermint and rosemary.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003eProtein 30% ; Fat 19%\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003eLifestage: Puppy\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003eSize: 3kg, 10kg \u0026amp; 20kg\u003cbr\u003e\u003c\/p\u003e\n\u003ch2\u003e\u003c\/h2\u003e","brand":"Black Hawk","offers":[{"title":"3kg","offer_id":32466406932560,"sku":"41120","price":39.53,"currency_code":"AUD","in_stock":true},{"title":"20kg","offer_id":32466406998096,"sku":"41121","price":150.53,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0484\/0009\/files\/black-hawk-dog-food-puppy-medium-breed-lamb-ricekellyville-pets-358640.png?v=1753537509"},{"product_id":"trainingpads10pkyd","title":"Yours Droolly Training Pads","description":"\u003cp\u003eYours Droolly Training Pads are perfect for toilet training puppies or to use for incontinent senior dogs. Featuring super-absorbent, five layer protection and sticky tabs to lock the pad in position it is ideal for that difficult house-breaking period. The five layer interlocking design rapidly absorbs up to three cups of liquid, keeping the surface layer dry to the touch in a minute and eliminating any chance of wet paw prints in your home, ensuring your floors remain hygienic and urine free.\u003cbr\u003e\u003c\/p\u003e\n\u003cp\u003eSizes available: 10pk, 30pk \u0026amp; 100pk\u003c\/p\u003e","brand":"Yours Droolly","offers":[{"title":"10pk","offer_id":32426905796688,"sku":"47902","price":19.99,"currency_code":"AUD","in_stock":true},{"title":"30pk","offer_id":32426905829456,"sku":"47903","price":39.99,"currency_code":"AUD","in_stock":true},{"title":"100pk","offer_id":39973671600208,"sku":"47904","price":79.99,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0484\/0009\/products\/yours-droolly-training-padskellyville-pets-597654.jpg?v=1753537654"},{"product_id":"rubber-ball-small-dog-toy","title":"Kazoo Rubber Ball Dog Toy","description":"\u003cp\u003eThe Kazoo Rubber Ball is both fun and very durable. Made from environmentally friendly rubber and available in a range of bright and fun colours, there is a range of different dog toys and sizes to help interact with and occupy your pet!\u003c\/p\u003e\n\u003cp\u003eSize: Small (5cm), Medium (6cm) \u0026amp; Large (8cm)\u003c\/p\u003e","brand":"Kazoo","offers":[{"title":"Small","offer_id":33142494986320,"sku":"47221","price":7.49,"currency_code":"AUD","in_stock":true},{"title":"Medium","offer_id":33142495019088,"sku":"47222","price":9.49,"currency_code":"AUD","in_stock":true},{"title":"Large","offer_id":33142495051856,"sku":"47223","price":13.99,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0484\/0009\/products\/kazoo-rubber-ball-dog-toykellyville-pets-519023.jpg?v=1753537902"},{"product_id":"rubber-bone-small-dog-toy","title":"Kazoo Rubber Bone Dog Toy","description":"\u003cp\u003eThe Kazoo Rubber Bone Small is both fun and very durable. Made from environmentally friendly rubber and available in a range of bright and fun colours, there is a range of different dog toys and sizes to help interact with and occupy your pet!\u003c\/p\u003e\n\u003cp\u003eSize: Small (12cm), Medium (14cm) \u0026amp; Large (19cm)\u003c\/p\u003e","brand":"Kazoo","offers":[{"title":"Small","offer_id":33142502654032,"sku":"47228","price":6.49,"currency_code":"AUD","in_stock":true},{"title":"Medium","offer_id":33142502686800,"sku":"47229","price":10.49,"currency_code":"AUD","in_stock":true},{"title":"Large","offer_id":33142502719568,"sku":"47230","price":13.99,"currency_code":"AUD","in_stock":false}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0484\/0009\/products\/kazoo-rubber-bone-dog-toykellyville-pets-517460.jpg?v=1753537905"},{"product_id":"kong-stuffn-liver-snacks-196g","title":"KONG Stuff'n Liver Snacks","description":"\u003cp\u003eKONG Stuff'N Liver Snacks are made with high-quality, natural ingredients. These tantalising treats can be used anytime, but are specially shaped and sized to fit your dog's KONG toy.\u003c\/p\u003e\n\u003cp\u003eSize: Small (200g) \u0026amp; Large (300g)\u003c\/p\u003e","brand":"KONG","offers":[{"title":"Small","offer_id":33143291707472,"sku":"49215","price":11.99,"currency_code":"AUD","in_stock":true},{"title":"Large","offer_id":33143291740240,"sku":"49715","price":14.99,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0484\/0009\/products\/kong-stuffn-liver-snackskellyville-pets-457230.jpg?v=1753537908"},{"product_id":"kong-stuffn-peanut-butter-snacks-196g","title":"KONG Stuff'n Peanut Butter Snacks","description":"\u003cp\u003eKONG Stuff'N Peanut Butter Snacks are made with high-quality, natural ingredients. These tantalising treats can be used anytime, but are specially shaped and sized to fit your dog's KONG toy.\u003c\/p\u003e\n\u003cp\u003eSize: 200g\u003c\/p\u003e","brand":"KONG","offers":[{"title":"200g","offer_id":33150366154832,"sku":"49765","price":11.99,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0484\/0009\/products\/kong-stuffn-peanut-butter-snackskellyville-pets-341302.jpg?v=1753537910"},{"product_id":"kong-stuffn-puppy-snacks-198g","title":"KONG Stuff'n Puppy Snacks","description":"\u003cp\u003eKONG Stuff'N Puppy Snacks are made with high-quality, natural ingredients. These tantalising dog and puppy treats can be used anytime, but are specially shaped and sized to fit your dog's KONG toy.\u003c\/p\u003e\n\u003cp\u003eSize: 200g\u003c\/p\u003e","brand":"KONG","offers":[{"title":"200g","offer_id":33150366449744,"sku":"41439","price":11.99,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0484\/0009\/products\/kong-stuffn-puppy-snackskellyville-pets-769816.jpg?v=1753537910"},{"product_id":"rubber-tug-small-dog-toy","title":"Kazoo Rubber Tug Dog Toy","description":"\u003cp\u003eThe Kazoo Rubber Tug is both fun and very durable. Made from environmentally friendly rubber and available in a range of bright and fun colours, there is a range of different dog toys and sizes to help interact with and occupy your pet!\u003c\/p\u003e\n\u003cp\u003eSize: Small (23 x 6cm), Medium (32 x 10cm) \u0026amp; Large (43 x 14cm)\u003c\/p\u003e","brand":"Kazoo","offers":[{"title":"Small","offer_id":33142738845776,"sku":"48233","price":8.49,"currency_code":"AUD","in_stock":true},{"title":"Medium","offer_id":33142738878544,"sku":"48234","price":10.49,"currency_code":"AUD","in_stock":true},{"title":"Large","offer_id":33142738911312,"sku":"48235","price":14.49,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0484\/0009\/products\/kazoo-rubber-tug-dog-toykellyville-pets-860826.jpg?v=1753537915"},{"product_id":"bowl-s-steel-4-litre","title":"Pet One Stainless Steel Dog Bowl","description":"\u003cp\u003eLet your pet feed from a bowl that will last for years! Pet One Stainless Steel Feeding Bowls are made from the highest quality stainless steel to ensure a lifetime of use.\u003c\/p\u003e\n\u003cp\u003eThe comprehensive range is available for all needs and requirements for your pet to ensure feeding time is made simple. You will be sure to find the right bowl from our Pet One Stainless Steel Bowl range for your pet for feeding time that will last a lifetime.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eFeatures \u0026amp; Benefits:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eMade from high quality stainless steel – hygienic, will not rust, crack or break\u003c\/li\u003e\n\u003cli\u003eDurable\u003c\/li\u003e\n\u003cli\u003eEasy to clean\u003c\/li\u003e\n\u003cli\u003eScratch resistant\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cstrong\u003eSuitable For:\u003c\/strong\u003e Dogs \u0026amp; Cats\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAvailable in 6 sizes:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eBowl Standard Stainless Steel 4L\u003c\/li\u003e\n\u003cli\u003eBowl Standard Stainless Steel 2.8L\u003c\/li\u003e\n\u003cli\u003eBowl Standard Stainless Steel 1.75L\u003c\/li\u003e\n\u003cli\u003eBowl Standard Stainless Steel 750ml\u003c\/li\u003e\n\u003cli\u003eBowl Standard Stainless Steel 350ml\u003c\/li\u003e\n\u003cli\u003eBowl Standard Stainless Steel 180ml\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cbr\u003e","brand":"Pet One","offers":[{"title":"180mL","offer_id":32689955012688,"sku":"42052","price":3.49,"currency_code":"AUD","in_stock":true},{"title":"350mL","offer_id":32689955045456,"sku":"42053","price":3.99,"currency_code":"AUD","in_stock":true},{"title":"750mL","offer_id":32689955078224,"sku":"42054","price":5.49,"currency_code":"AUD","in_stock":true},{"title":"1.75L","offer_id":32689955110992,"sku":"42055","price":7.49,"currency_code":"AUD","in_stock":true},{"title":"2.8L","offer_id":32689955143760,"sku":"42056","price":8.49,"currency_code":"AUD","in_stock":true},{"title":"4.0L","offer_id":32689955176528,"sku":"42057","price":15.49,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0484\/0009\/products\/pet-one-stainless-steel-dog-bowlkellyville-pets-874581.jpg?v=1753537991"},{"product_id":"cabana-dog-house-cappuccino-xs","title":"Kazoo Cabana Dog House Cappuccino","description":"\u003cp\u003e\u003cspan\u003eLooking for a unique, weather-proof, easy set-up kennel for your dog? We have you covered. Our Dog Cabana keeps your pet dry in wet-weather and cool in the warmer months. It's easy to clean and both the mat and cover can be replaced.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBEST BITS:\u003c\/strong\u003e\u003cbr\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eWaterproof\u003cbr\u003e\n\u003c\/li\u003e\n\u003cli\u003eRust resistant frame\u003c\/li\u003e\n\u003cli\u003eRemovable washable cover\u003c\/li\u003e\n\u003cli\u003eSuper strong - base holds up to 200kg without warping\u003c\/li\u003e\n\u003cli\u003eReplacement covers available\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ctable\u003e\n\u003ctbody\u003e\n\u003ctr\u003e\n\u003ctd\u003e\u003cbr\u003e\u003c\/td\u003e\n\u003ctd\u003e\u003cstrong\u003eSMALL\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd\u003e\u003cstrong\u003eMEDIUM \u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd\u003e\u003cstrong\u003eLARGE\u003c\/strong\u003e\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003e\n\u003cp\u003e\u003cbr\u003e\u003c\/p\u003e\n\u003c\/td\u003e\n\u003ctd\u003e\n\u003cspan\u003eWidth: 60cm \u003c\/span\u003e\u003cbr\u003e\u003cspan\u003eDepth: 70cm\u003c\/span\u003e\u003cbr\u003e\u003cspan\u003eHeight: 60cm\u003c\/span\u003e\n\u003c\/td\u003e\n\u003ctd\u003e\n\u003cspan\u003eWidth: 75cm \u003c\/span\u003e\u003cbr\u003e\u003cspan\u003eDepth: 90cm\u003c\/span\u003e\u003cbr\u003e\u003cspan\u003eHeight: 75cm\u003c\/span\u003e\n\u003c\/td\u003e\n\u003ctd\u003e\n\u003cspan\u003eWidth: 90cm \u003c\/span\u003e\u003cbr\u003e\u003cspan\u003eDepth: 110cm\u003c\/span\u003e\u003cbr\u003e\u003cspan\u003eHeight: 90cm\u003c\/span\u003e\n\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003e\n\u003cp\u003e\u003cem\u003e\u003cbr\u003e\u003c\/em\u003e\u003c\/p\u003e\n\u003c\/td\u003e\n\u003ctd\u003e\n\u003cp\u003e\u003cem\u003eSuits breeds:\u003c\/em\u003e\u003cbr\u003e\u003cspan\u003e- Cavalier King Charles Spaniel\u003cbr\u003e- Corgi\u003cbr\u003e- Fox Terrier\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/td\u003e\n\u003ctd\u003e\n\u003cp\u003e\u003cem\u003eSuits breeds:\u003c\/em\u003e\u003cbr\u003e\u003cspan\u003e- Beagle\u003cbr\u003e- Staffy\u003cbr\u003e- Border Collie\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/td\u003e\n\u003ctd\u003e\n\u003cp\u003e\u003cem\u003eSuits breeds:\u003c\/em\u003e\u003cbr\u003e\u003cspan\u003e- Boxer\u003cbr\u003e- German Shephard\u003cbr\u003e- Rottweiler\u003cbr\u003e- Siberian Husky\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003c\/tbody\u003e\n\u003c\/table\u003e","brand":"Kazoo","offers":[{"title":"Small","offer_id":39378076205136,"sku":"41276","price":104.3,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0484\/0009\/products\/15151_Kazoo_CabanaDogHouse_Cappaccino_Small_049e02bc-1080-4ecf-aafvdsvavs2-58644fedb1c6.jpg?v=1753537995"},{"product_id":"blackhawk-puppy-chicken-rice-20kg","title":"Black Hawk Dog Food Puppy Medium Breed Chicken \u0026 Rice","description":"\u003cp\u003eMade with Australian chicken, a highly digestible lean protein source packed with essential amino acids for strong muscles, healthy bones, and vitality. This balanced high-quality diet also includes sweet potato which is a rich source of fibre for intestinal health and omega-3 fatty acids from fish oil for brain development.\u003cbr data-mce-fragment=\"1\"\u003e\u003cbr data-mce-fragment=\"1\"\u003eDelicious fruit duo blueberries and cranberries rich in antioxidants may help immunity and natural defences, while rosemary a highly effective natural preservative may improve cell function. A blend of Australian sourced rice and oats helps provide energy to the developing body and brain in this puppy food.\u003cbr\u003e\u003c\/p\u003e\n\u003cp\u003eIngredients: Chicken meal, rice, oats, chicken fat, chickpeas, faba beans, hydrolysed chicken protein, turkey meal, beet pulp, chicken digest, fish oil, essential vitamins and minerals (see tables), sweet potato, pumpkin, chicory root, natural yeast extracts, sea kelp, tomato, Yucca schidigera extract, natural antioxidants, algae β-glucan, D-glucosamine, emu oil, green lipped mussel, blueberries, carrots, cranberries, dandelion, peppermint and rosemary.\u003cbr\u003e\u003c\/p\u003e\n\u003cdiv\u003eProtein 30% ; Fat 18%\u003c\/div\u003e\n\u003cbr\u003e\n\u003cdiv\u003e\u003c\/div\u003e\n\u003cdiv\u003e\u003c\/div\u003e\n\u003cdiv\u003eLifestage: Puppy\u003c\/div\u003e\n\u003cbr\u003e\n\u003cdiv\u003e\u003c\/div\u003e\n\u003cdiv\u003e\u003c\/div\u003e\n\u003cp\u003eSize: 3kg, 10kg \u0026amp; 20kg\u003c\/p\u003e","brand":"Black Hawk","offers":[{"title":"20kg","offer_id":32466404114512,"sku":"41216","price":150.53,"currency_code":"AUD","in_stock":true},{"title":"3kg","offer_id":32466404048976,"sku":"41219","price":39.53,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0484\/0009\/files\/black-hawk-dog-food-puppy-medium-breed-chicken-ricekellyville-pets-697056.png?v=1753538395"},{"product_id":"australian-pet-treats-chicken-lamb-trainups500g","title":"Evolution Australian Pet Treats Chicken Trainups Dog Treat","description":"\u003cp data-mce-fragment=\"1\"\u003eAustralian Pet Treats Chicken Trainups are healthy dog treats naturally high in protein. These chicken \u0026amp; lamb dog treats are slowly air dried, to ensure that the nutritional integrity and flavour are retained and essential vitamins, minerals and nutrients are preserved throughout the entire process.\u003c\/p\u003e\n\u003cp data-mce-fragment=\"1\"\u003eFor dogs to thrive and live a long and healthy life, they should eat the food that nature intended them to. As they are carnivores, their bodies do not easily digest carbohydrates like grains, wheat, corn and soy, therefore a natural dog food diet based on real meat, is perfect for their health and wellbeing.\u003c\/p\u003e\n\u003cp data-mce-fragment=\"1\"\u003eThat’s why APT has combined 100% Australian Chicken and Lamb with high quality ingredients to create, a Grain and Gluten free dog treat that your pup will find irresistible.\u003c\/p\u003e\n\u003ch4 data-mce-fragment=\"1\"\u003eIngredients: \u003c\/h4\u003e\n\u003cp data-mce-fragment=\"1\"\u003e\u003cspan\u003eAustralian Chicken meat, Vegetable glycerine, Australian Lamb meat, Amino acids, Vitamins and minerals (Vit C, A, D3, B, Thiamine, Calcium, Iron, Zinc), Salt, Natural herbs, Potassium sorbate\u003c\/span\u003e\u003c\/p\u003e\n\u003ch4 data-mce-fragment=\"1\"\u003e\u003cspan\u003eTypical Analysis: \u003c\/span\u003e\u003c\/h4\u003e\n\u003cp data-mce-fragment=\"1\"\u003e\u003cspan\u003eCrude Protein: 34.6%, Crude Fat: 9.8%, Crude Fibre: 0.1%, Sodium: 2.5%, ME 315 kcal\/100g\u003c\/span\u003e\u003c\/p\u003e\n\u003cp data-mce-fragment=\"1\"\u003e\u003cspan\u003eSize: 150g \u0026amp; 400g\u003c\/span\u003e\u003c\/p\u003e","brand":"Australian Pet Treats","offers":[{"title":"400g","offer_id":40443924774992,"sku":"45947","price":25.99,"currency_code":"AUD","in_stock":true},{"title":"150g","offer_id":32546375401552,"sku":"47262","price":10.49,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0484\/0009\/files\/evolution-australian-pet-treats-chicken-trainups-dog-treatkellyville-pets-839283.png?v=1753538452"},{"product_id":"ivory-coat-puppy-grain-free-13kg","title":"Ivory Coat Grain Free Dog Food Puppy Chicken","description":"\u003cp\u003e\u003cem data-mce-fragment=\"1\"\u003e\u003c\/em\u003eJust like us, some dogs may be more sensitive than others when it comes to certain ingredients – even natural grains. Feed your sensitive mate with confidence with Ivory Coat's specifically formulated Grain Free products. \u003cbr\u003e\u003cbr\u003eTheir Grain Free Puppy Chicken formula contains only poultry protein, tailored for dogs who are sensitive to other protein sources, and with 32% protein is developed to support your puppies healthy growth and optimal muscle mass. \u003cbr\u003e\u003cbr\u003eAustralian meat is the #1 Ingredient to deliver quality protein for lean muscle maintenance. They also use carefully selected vegetables to provide sources of grain free complex carbohydrates and fibre to help support a healthy gut. A natural superfood blend (including Tomato, Apple, Carrot, Pumpkin, Kale, Blueberries, Spinach \u0026amp; Cranberries) is added as a source of antioxidants, as well as Omega 3 \u0026amp; 6 to help support healthy skin \u0026amp; coat. A natural pre-biotic is also included to support healthy digestion, and essential vitamins and minerals ensure your best mate is provided with their complete daily nutrition.\u003cbr\u003e\u003cbr\u003eNot only does Ivory Coat taste delicious, it contains NO added wheat, corn, rice or soy, and is formulated with no added artificial colours, flavours or preservatives. They use only quality ingredients for a great tasting, digestible and nutritious meal.\u003cbr\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eOptimised levels of quality poultry protein for lean muscle growth in sensitive puppies\u003c\/li\u003e\n\u003cli\u003eQuality protein for lean muscle maintenance\u003c\/li\u003e\n\u003cli\u003eNatural fibre for healthy digestion and firmer stools\u003c\/li\u003e\n\u003cli\u003eOmega 3 \u0026amp; 6 for healthy skin and coat\u003c\/li\u003e\n\u003cli\u003eYucca for stool odour control\u003c\/li\u003e\n\u003cli\u003eNatural prebiotics for the beneficial growth of healthy gut microflora\u003c\/li\u003e\n\u003cli\u003eSuperfoods source of antioxidants\u003c\/li\u003e\n\u003cli\u003eNo added artificial colours, flavours or preservatives\u003c\/li\u003e\n\u003cli\u003eMeets the AAFCO nutritional guidelines for growth\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eIngredients: Dehydrated Australian Poultry, Peas, Lentils, Australian Chicken, Pea Protein, Chicken Fat, Sweet Potato, Tapioca, Beet Pulp, Chicken Digest, Salmon Oil, Linseed, Canola Oil, Salt, Dicalcium Phosphate, Potassium Chloride, Choline Chloride, Chicory Root Inulin, Vitamins and Minerals, Superfood Blend (Tomato, Apple, Carrot, Pumpkin, Kale, Blueberries, Spinach, Cranberries), Natural Antioxidants, Yucca Schidigera Extract, Vitamin E.\u003cbr data-mce-fragment=\"1\"\u003e\u003c\/p\u003e\n\u003cp\u003eProtein 32% ; Fat 16%\u003c\/p\u003e\n\u003cp\u003eLifestage: Puppy\u003c\/p\u003e\n\u003cdiv\u003e\n\u003cp\u003eSize: 2kg \u0026amp; 13kg\u003c\/p\u003e\n\u003c\/div\u003e","brand":"Ivory Coat","offers":[{"title":"2kg","offer_id":32475197014096,"sku":"49466","price":34.84,"currency_code":"AUD","in_stock":false},{"title":"13kg","offer_id":32475197046864,"sku":"49478","price":147.04,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0484\/0009\/products\/ivory-coat-grain-free-dog-food-puppy-chickenkellyville-pets-755637.jpg?v=1753538516"},{"product_id":"kazoo-dog-crate-mobile-dog-home-small","title":"Kazoo Premium Dog Crate","description":"\u003cp\u003eThe Kazoo Mobile Home Deluxe Dual Door dog enclosure is a great way to temporarily house your beloved pet. It is the perfect crate for both feeding and toilet training.\u003c\/p\u003e\n\u003cp\u003eThis mobile dog home is tough and durable, with an easy-to-clean plastic tray for its base. The Kazoo dog crate assembles and collapses in mere seconds and comes with a powder coated finish on a heavy duty metal wire frame.\u003c\/p\u003e\n\u003cp\u003eCrate does not include Pillow.\u003c\/p\u003e\n\u003cp\u003e\u003ca href=\"https:\/\/www.kellyvillepets.com.au\/products\/crate-cover-kazoo\" target=\"_blank\" title=\"Kazoo Crate Cover\" rel=\"noopener\"\u003eCrate covers available separately\u003c\/a\u003e.\u003c\/p\u003e\n\u003ctable style=\"width: 545px;\" data-mce-style=\"width: 545px;\"\u003e\n\u003ctbody\u003e\n\u003ctr style=\"height: 33px;\"\u003e\n\u003ctd style=\"width: 97px;\" data-mce-style=\"width: 97px;\"\u003e\u003c\/td\u003e\n\u003ctd style=\"width: 97px;\" data-mce-style=\"width: 97px;\"\u003e\n\u003cp\u003e\u003cstrong\u003eLength\u003c\/strong\u003e\u003c\/p\u003e\n\u003c\/td\u003e\n\u003ctd style=\"width: 90px;\" data-mce-style=\"width: 90px;\"\u003e\n\u003cp\u003e\u003cstrong\u003eWidth\u003c\/strong\u003e\u003c\/p\u003e\n\u003c\/td\u003e\n\u003ctd style=\"width: 90px;\" data-mce-style=\"width: 90px;\"\u003e\n\u003cp\u003e\u003cstrong\u003eHeight\u003c\/strong\u003e\u003c\/p\u003e\n\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr style=\"height: 36px;\"\u003e\n\u003ctd style=\"width: 97px;\" data-mce-style=\"width: 97px;\"\u003e\u003cstrong\u003eSmall\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd style=\"width: 97px;\" data-mce-style=\"width: 97px;\"\u003e61cm\u003c\/td\u003e\n\u003ctd style=\"width: 90px;\" data-mce-style=\"width: 90px;\"\u003e46cm\u003c\/td\u003e\n\u003ctd style=\"width: 90px;\" data-mce-style=\"width: 90px;\"\u003e53cm\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr style=\"height: 36px;\"\u003e\n\u003ctd style=\"width: 97px;\" data-mce-style=\"width: 97px;\"\u003e\u003cstrong\u003eMedium\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd style=\"width: 97px;\" data-mce-style=\"width: 97px;\"\u003e76cm\u003c\/td\u003e\n\u003ctd style=\"width: 90px;\" data-mce-style=\"width: 90px;\"\u003e53cm\u003c\/td\u003e\n\u003ctd style=\"width: 90px;\" data-mce-style=\"width: 90px;\"\u003e61cm\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr style=\"height: 33px;\"\u003e\n\u003ctd style=\"width: 97px;\" data-mce-style=\"width: 97px;\"\u003e\u003cstrong\u003eLarge\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd style=\"width: 97px;\" data-mce-style=\"width: 97px;\"\u003e91cm\u003c\/td\u003e\n\u003ctd style=\"width: 90px;\" data-mce-style=\"width: 90px;\"\u003e61cm\u003c\/td\u003e\n\u003ctd style=\"width: 90px;\" data-mce-style=\"width: 90px;\"\u003e69cm\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr style=\"height: 29px;\"\u003e\n\u003ctd style=\"width: 97px;\" data-mce-style=\"width: 97px;\"\u003e\u003cstrong\u003eX Large\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd style=\"width: 97px;\" data-mce-style=\"width: 97px;\"\u003e110cm\u003c\/td\u003e\n\u003ctd style=\"width: 90px;\" data-mce-style=\"width: 90px;\"\u003e71cm\u003c\/td\u003e\n\u003ctd style=\"width: 90px;\" data-mce-style=\"width: 90px;\"\u003e79cm\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr style=\"height: 31px;\"\u003e\n\u003ctd style=\"width: 97px;\" data-mce-style=\"width: 97px;\"\u003e\u003cstrong\u003eXX Large\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd style=\"width: 97px;\" data-mce-style=\"width: 97px;\"\u003e122cm\u003c\/td\u003e\n\u003ctd style=\"width: 90px;\" data-mce-style=\"width: 90px;\"\u003e76cm\u003c\/td\u003e\n\u003ctd style=\"width: 90px;\" data-mce-style=\"width: 90px;\"\u003e84cm\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003c\/tbody\u003e\n\u003c\/table\u003e","brand":"Kazoo","offers":[{"title":"Small","offer_id":32374854975568,"sku":"48678","price":135.0,"currency_code":"AUD","in_stock":true},{"title":"Medium","offer_id":32374855008336,"sku":"48679","price":159.0,"currency_code":"AUD","in_stock":true},{"title":"Large","offer_id":32374855041104,"sku":"48680","price":199.0,"currency_code":"AUD","in_stock":true},{"title":"X-Large","offer_id":32374855073872,"sku":"48681","price":275.0,"currency_code":"AUD","in_stock":true},{"title":"XX-Large","offer_id":32374855106640,"sku":"48682","price":299.0,"currency_code":"AUD","in_stock":false}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0484\/0009\/products\/kazoo-premium-dog-cratekellyville-pets-955593.jpg?v=1753538572"},{"product_id":"advantage-seresto-puppy-small-dogs-up-to-8kg","title":"Seresto Collar Fleas \u0026 Ticks for Dogs and Puppies Up to 8kg Blue","description":"\u003cp\u003eThe Seresto™ collar is the longest lasting flea and paralysis tick protection for dogs and puppies, providing consistent protection for 8 months. Seresto™ is an odourless, water-resistant* collar that works by contact, so there’s no need for fleas and ticks to bite. It's the simple way to keep your best friend protected!\u003cbr\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eEasy to apply, long-lasting collar for dogs \u0026amp; puppies\u003cbr\u003e\n\u003c\/li\u003e\n\u003cli\u003eControls paralysis ticks for 8 months\u003cbr\u003e\n\u003c\/li\u003e\n\u003cli\u003eControls fleas for 8 months\u003cbr\u003e\n\u003c\/li\u003e\n\u003cli\u003eControls brown dog \u0026amp; bush ticks for 4 months\u003cbr\u003e\n\u003c\/li\u003e\n\u003cli\u003eReduces transmission of \u003cem\u003eEhrlichia canis\u003c\/em\u003e, \u003cem\u003eBabesia vogeli\u003c\/em\u003e \u0026amp; \u003cem\u003eAnaplasma platys\u003c\/em\u003e by the brown dog tick for 4 months\u003cbr\u003e\n\u003c\/li\u003e\n\u003cli\u003eTreats lice\u003cbr\u003e\n\u003c\/li\u003e\n\u003cli\u003eWorks on contact, so there's no need for fleas or ticks to bite to die\u003cbr\u003e\n\u003c\/li\u003e\n\u003cli\u003eOdourless \u0026amp; water resistant\u003cbr\u003e\n\u003c\/li\u003e\n\u003cli\u003eSafe for puppies from 7 weeks of age and no minimum weight\u003cbr\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"Seresto","offers":[{"title":"Default Title","offer_id":41228629016656,"sku":"47678","price":59.49,"currency_code":"AUD","in_stock":false}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0484\/0009\/products\/seresto-collar-flea-tick-prevention-for-dogskellyville-pets-163505.png?v=1753538617"},{"product_id":"pawise-handy-waterer-500ml","title":"PaWise Handy Waterer","description":"\u003cp\u003e The handy waterer for outdoor use!\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eAlways fresh water \u003c\/li\u003e\n\u003cli\u003eFast and easy handling \u003c\/li\u003e\n\u003cli\u003eEnsures the dog owner's mobility due to hook or shoulder strap \u003c\/li\u003e\n\u003cli\u003eFor watering simply fold out the bottle and pull it up a little \u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cbr\u003eSize: 500mL \u0026amp; 750mL\u003c\/p\u003e","brand":"PaWise","offers":[{"title":"500mL","offer_id":32951427366992,"sku":"49068","price":8.49,"currency_code":"AUD","in_stock":true},{"title":"750mL","offer_id":32951427399760,"sku":"49069","price":12.49,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0484\/0009\/products\/pawise-handy-watererkellyville-pets-481952.jpg?v=1753538674"}],"url":"https:\/\/www.kellyvillepets.com.au\/collections\/puppy\/cheese+long-lead.oembed","provider":"Kellyville Pets","version":"1.0","type":"link"}